Standards and Best Practice Guidelines
The following referenced documents are in addition to those given in the preceding sections. These represent a small sample of commonly used documents, and it is not intended as an exhaustive list. Geotechnical professionals are expected to use and reference other materials as appropriate to the design situation. NZS 1170.0 2002. Structural design actions – Part 0: General principles. NZS 1170.5 2004. Structural design actions – Part 5: Earthquake actions – New Zealand. NZS 1170.5 Supp 1:2004. Structural design actions – Part 5: Earthquake actions – New Zealand. Commentary. NZS 4404:2010. Land development and subdivision infrastructure. NZS 4431:1989. Code of practice for earth fill for residential development. NZS 4402:1986. Methods of testing soils for civil engineering purposes – Soil tests. Parts 1 to 7. NZS 3604:2011. Timber-framed buildings. NZS 4429:2013. Concrete masonry building not requiring specific engineering design. New Zealand Geotechnical Society Inc. Field description of soil and rock. 2005. New Zealand Geotechnical Society Inc. Guideline for handheld shear vane test. 2001. Crawford, S.A, and Millar, P.J. The design of permanent slopes for residential building development’. EQC Research Project 95/183, NZ Geomechanics News (June 1998). Waka Kotahi New Zealand Transport Agency. Bridge manual (SP/M/022) Version 3. May 2013. Ministry for the Environment. Resource Management (National Environmental Standard for Assessing and Managing Contaminants in Soil to Protect Human Health) Regulations 2011. Ministry of Business, Innovation and Employment. Practice Advisory 17: Well-planned ground investigations can save costs. ISBN: 978-0-947497-63-7. New Zealand Geotechnical Society. New Zealand Ground Investigation Specification. 28 April 2017. Planning and engineering guidance for potentially liquefaction-prone land. Resource Management Act and Building Act aspects. Ministry of Business, Innovation and Employment. Planning for Development of Land on or Close to Active Faults. A guideline to assist resource management planners in New Zealand. Report prepared for Ministry for the Environment by Janine Kerr, Simon Nathan, Russ Van Dissen, Peter Webb, David Brunsdon and Andrew King. 2003. Rockfall: Design considerations for passive protection structures. October 2016. Ministry of Business, Innovation and Employment. UK National House Building Council Standards (2020). Chapter 4 – Foundations. Guidance on embedded retaining wall design. CIRIA C760. London, 2017. Environment Bay of Plenty Regional Council. Erosion and sediment control: Guidelines for Soil Disturbing Activities. Guideline 2010/01.June 2010. https://www.boprc.govt.nz/media/29555/Guideline-100624-ErosionandSedimentControl.pdf Environment Waikato Technical Report No.2009/02. Erosion and sediment control: Guidelines for Soil Disturbing Activities. January 2019. http://waikatoregion.govt.nz/assets/WRC/WRC-2019/TR0902.pdf. www.waikatoregion.govt.nz/assets/PageFiles/2947-earthworks/1/Erosion-and-sediment-control-plan-preparation-guideline.pdf ASTM D5778-12. Standard test method for electronic friction cone and piezocone penetration testing of soils. 2012. Dellow, G.D., 2010. Distribution and engineering properties of young lake sediments in Rotorua District, GNS Science Consultancy Report 2010/81. 13p. Scott, B.J., 2010. Rotorua District Council Hazard Studies, Part 1: Volcano and geothermal Hazards. GNS Science Consultancy Report 2010/67. 31p. Nairn, I.A. 2002. Geology of the Okataina Volcanic Centre: sheets part U15, part U16, part V15 & part V16, scale 1:50,000. Institute of Geological & Nuclear Sciences Geological Map 25. Form 1A: Statement of Professional Opinion as to Suitability of Land for Subdivision Development: Owner/Developer: Location: I, (Full name) of (Name and address of firm) hereby confirm that: I am a geo-professional as defined in clause 1.2.2 of NZS 4404:2010 and was retained by the owner / developer as the geo-professional on the above development. Site investigations have been carried out under my direction and are described in my report. I am aware of the details of the proposed scheme of subdivision and of the general nature of proposed engineering works as shown on the following drawings: (Insert reference to all drawings including dates of latest amendments) I confirm that I have considered the level of complexity, which I believe to be Level _________. I confirm that I am suitably qualified and experienced to undertake the geotechnical assessment for this level of complexity. In my professional opinion, not to be constructed as a guarantee, I certify that the proposed works give due regard to land slope and foundation stability considerations and that the land is suitable for the proposed subdivision, providing that: (Continue on additional page if required) This professional opinion is furnished to the Council and the owner/developer for their purposes alone on the express condition that it will not be relied upon by any other person and does not remove the necessity for the normal inspection of foundation conditions at the time of erection of any dwelling. Signed: Dated: Council’s property file/LIM has been reviewed for relevant information. Form 1B: Statement of Professional Opinion as to Suitability of Land for Building Development Development: Owner/Developer: Location: I, (Full name) of (Name and address of firm) hereby confirm that: I am geo-professional as defined in clause 1.2.2 of NZS 4404:2010 and was retained by the owner / developer as the geo-professional on the above development. The extent of my inspections during construction, and the results of all tests carried out are described in the Geotechnical Completion Report: In my professional opinion, not be construed as a guarantee, I certify that: That earth fills shown on the attached Plan No. _____________have been placed in compliance with the Regional Infrastructure Technical Specification. The completed works give due regard to the requirements of S71, S72 and S73 of the Building Act 2004 The filled ground is suitable for the erection thereon of residential buildings requiring / not requiring specific engineering design in terms of NZ Building Act 2004 and NZ Building Regulations 1992, and related documents, providing that: (Continue on additional page if required) The original ground not affected by filling is suitable for the erection thereon of residential buildings requiring / not requiring specific design in terms of NZ Building Act 2004 and NZ Building Regulations 1992, and related documents, providing that: (Continue on additional page if required) This professional opinion is furnished to the Council and the owner/developer for their purposes alone on the express condition that it will not be relied upon by any other person and does not remove the necessity for the normal inspection of foundation conditions at the time of erection of any dwelling. Signed: Dated: Council’s property file/LIM has been reviewed for relevant information.
